Global Foam Lightweight market trend 2023-2026 Construction Precautions for Foam Lightweight Soil by Newskennel35

The US President recently said the conflict between Russia and Ukraine had driven up the prices of all the world's major food staples, including wheat, corn, barley, oilseeds and edible oils, and that Russia and Ukraine together supplied more than 25% of the world's wheat exports and about 20% of its barley exports. 

To address the food shortage, the Biden administration says it plans to increase the number of counties eligible for insurance for double cropping. Double cropping is when farmers grow two different crops a year on the same field. 

Under Biden's plan, the number of counties eligible for two-season crop insurance would increase by 681, for a total of 1,935. 

The UN has warned that up to 1.7bn people are "highly exposed" to the domino effect of the conflict between Russia and Ukraine on the global food, energy, and financial systems.  The agency says conflict could increase hunger in countries where people are already suffering from malnutrition.

Even countries where food is less scarce are being hit by rising prices. U.S. grocery prices rose 1% in April, compared with a 10.8% increase over the past 12 months, the Labor Department said recently.

According to the White House, global food prices have risen nearly 13 percent since the outbreak of the Russia-Ukraine conflict. 

Besides, affected by the ever-changing international situation, the supply and prices of international bulk Foam Lightweight are still very uncertain.


The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh, and the lap joint shall be thermally welded, and the lap width shall not be less than 10cm. 

When laying, it should be flattened and tightened to avoid local rolling up. If necessary, U-shaped nails can be used for anchoring. When laying the metal mesh, U-shaped nails should be used for anchoring, the longitudinal anchorage spacing is 2m, and the transverse anchorage spacing is 1.0m. The plane position of the metal mesh should be overlapped and overlapped, the width of the overlap should not be less than 5cm, and the overlap should be bound with plastic buckles and anchored with U-shaped nails.


Before the light soil is poured, according to the boundary conditions of the construction site, the pouring area and the pouring layer are first divided, and the base is checked to ensure that the base is free of debris and water, and that the base elevation meets the design requirements and should meet the following requirements:

1) The top surface area of a single pouring area should not exceed 400m2.

2) The length in the long axis direction of a single pouring area should not exceed 20m.

3) 1.8cm thick wooden plywood is used to support the spacing and joints in the adjacent pouring area. The wooden plywood is a temporary support template and is also used as a deformation joint filling and must not be removed.

4) The thickness of the single-layer pouring layer should be controlled within the range of 0.3-1.0m.

5) The thickness of 0.8m at the top of the light soil subgrade must be used as an independent single-layer pouring layer, and the layer should be poured at one time in each pouring area.


Construction Control Points

1) For the adjacent pouring layers in the same section, when the temperature during the construction period is not lower than 15℃, the shortest pouring interval can be controlled by 8 hours; otherwise, the pouring interval should not be less than 12 hours.

2) The pouring construction time of the pouring layer in a single pouring area of foam light soil should be controlled within 2 hours.

3) It should be poured from one end to the other end along the long axis of the pouring area; if more than one pouring pipe is used for pouring, it can be poured side by side from one end, or the diagonal pouring method can be used.

4) During the pouring process, when the pouring pipe needs to be moved, it should be moved back and forth along the direction in which the pouring pipe is placed, and it is not appropriate to move the pouring pipe left and right; Move to the soil surface.

5) During the pouring process, the discharge port of the pouring pipe should be placed below the current pouring surface as much as possible; in other cases such as the surface being smoothed, the distance between the discharge port of the pouring pipe and the current pouring surface should not be higher than 1.5m.

Care and Maintenance

After the top surface of the light soil pouring area is poured to the design elevation, the surface should be covered with plastic film to moisturise and maintain the light soil roadbed; or non-woven geotextile covering and watering should be used for maintenance. The curing time is not less than 7 days. 

Before the top of the light soil subgrade is filled with soil, it is strictly forbidden to drive construction machinery on it; if it is unavoidable in some areas, a temporary protective layer with a thickness of not less than 50cm should be laid at a suitable position or covered with steel plates as a temporary access road for Construction machinery travels.


Connection with other processes

The top improved soil must be constructed when the maintenance strength of the light soil under the same conditions reaches 1.5MPa. During construction, it is strictly forbidden for large machinery such as dump trucks, road rollers, and bulldozers to directly walk on the top surface of the light soil. Paving and rolling are carried out in the forward way of leveling and rolling, that is, unloading trucks and road rollers should unload and walk at the rear end of the leveling machine.


During the rainy season, special measures should be taken to prevent and drain the water and soil, especially to prevent water and soil loss. Measures such as film covering and setting of temporary drainage ditches should be adopted to avoid slope erosion and prevent a large amount of water and soil from flowing to the lower light soil pouring surface for pollution. Light soil.


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


Recently, Russia's deputy prime minister said that the number of countries buying Russian oil is increasing, including Asian countries. Russia will use the "East Siberia-Pacific" pipeline system to increase exports to Asian countries and promote the diversification of oil output.  

He also said that Russian oil Foam Lightweight are expected to continue to increase in the future.

Inquery us

Our Latest Answers

Global Bi2O3 powder market trend 2023-2026 Bismuth Oxide Bi2O3 Powder Supplier by Newskennel35

Europe's largest economy, Germany, recently activated an emergency plan to manage gas supplies that the natural gas could be rationed if supplies are disrupted or disrupted by a stand-off over Russian demands to pay for fuel in rubles. German Vice-C…

Global bismuth sulfide, bismuth sulfide overview, bismuth sulfide application, bismuth sulfide suppliers, bismuth sulfide price market trend 2023-2030 Why is bismuth comparable to gold? by Newskennel35

Bismuth sulfide is a chemical substance with the molecular formula Bi2S3,insoluble in water, toxic, weakly radioactive, and harmless to the human body.…

Global Inconel 718 Alloy market trend 2022-2030 Properties and Applications of Inconel 718 Alloy by Newskennel35

Inconel 718 alloys is a precipitation-hardening nickel-iron-based superalloy containing niobium and molybdenum. Its microstructure is austenite and has excellent comprehensive properties.…